美女131高清图片大全 app,马背上不停的撞击公主

24-hour service hotline:
18630285671
18633260333
contact us
Xushui Hongyuan Municipal Building Materials Co., Ltd. Address: Xushui Industrial Park, Hebei Mobile: 18630285671
QQ: 780039983
Website: allthebuses.com
Your present location: Home > News > Technical Support
Installation points of anti-theft manhole cover
2014-03-25 15:32:21 From: admin

Xushui Cement Manhole Cover Manufacturer 1. Installation instructions: The anchoring sheet of the supporting frame must be firmly embedded in the cement layer; 2. Type layout according to the length of the trench (well), take the standard board width 995mm in accordance with the processing modulus, and leave a gap of 5mm between boards ; 3. The supporting surfaces on both sides of the ditch must be flat and solid; 4. The remaining length of the ditch (well) less than 1 meter is determined by the modulus; 5. The steel grid plate model is selected according to the ditch (well) width and bearing requirements ; 6. It is recommended to choose a standard size for design and construction; 7. The direction of flat steel is the direction of bearing (support), and the length L of flat steel is determined according to the width of the trench (well).

Home | Company Profile | News | Products | Success Stories | Contact Us

Copyright Xushui Hongyuan Municipal Building Materials Co., Ltd. Address: Xushui Industrial Park, Hebei
Mobile: 18630285671
ICP No. 18005390-1

No. 13060902000179 of Hebei Public Security Bureau